Work Breakdown Structure Builder

Before estimating a project that is too big to scope in one piece.

The prompt
Decompose [project deliverable] into a work breakdown structure with 3 levels. Each leaf node should be estimable and assignable. Flag any node that is still ambiguous.

Anything in square brackets is meant to be replaced. The builder turns those into fields you can type into.