Before training, so evaluation is not an afterthought.
Design an evaluation plan for [model/task]. Specify: the metrics, the dataset splits, the baselines, and the failure cases to test. Define what 'good enough to ship' means quantitatively.
Anything in square brackets is meant to be replaced. The builder turns those into fields you can type into.
Tired of re-pasting the same context into every new chat? That is what the Unimatrix MCP server is for.